DIFFICULTIES

  • Combined cycle power plant which required high technical requirements and large amount of engineering work.

  • Second hand engines


SOLUTION

Overhauled the engines to a 0 running hour condition.


RESULT

  • Passed the Factory Acceptance Test (FAT) in a single trial which is very difficult for 2nd hand engines.

  • Requirements for the fuel consumption and power output were met as well during our FAT.

    142mw-combined-cycle-power-plant-in-bangladesh.jpg


Jul 22 , 2024
The Australian Power Plant EPC project undertaken by the company, through the efforts of various departments and project teams, has successfully passed the factory acceptance test of all auxiliary machinery and electrical equipment on August 11 and received high praise from our customers.

Stay Updated with the Latest Innovations and Trends in the Power Industry

For more industry news and updates, visit:
https://power.in-en.com/news/



May 16 , 2024
In the dynamic landscape of global energy, PDV Power has emerged as a beacon of innovation and efficiency, particularly in the realm of Heavy Fuel Oil (HFO) power plants.
May 16 , 2024
In the dynamic world of energy investment, PDV Power has emerged as a visionary, taking bold steps into the realm of Independent Power Plant (IPP) projects.